Skip to product information
1 of 9

Allrey

FARBIN Loud Air Horn 12V, Train Horn for Truck with Air Compressors 150dB, for Any 12V Car Motorcycle Pickups SUV Lorrys Trucks Boats (Black)

Regular price $35.49 USD
Regular price Sale price $35.49 USD
Shipping calculated at checkout.
颜色

Product description

LT

LT

Upgraded integrated design air horn is made of high quality chrome-zinc plating material, which ensures durabilit and can work in various temperature.

LT

Not need bulky Air can the newly upgraded air horn compressor has long red copper coil inside, and the surface is vacuum chrome plated.

LT

Train Horn suitable for Any 12V Vehicle, including Trucks, Cars, Suvs, Pickups, Yachts, Jeeps, Motorcycles, Van, Off road vehicle, Busses, Etc.

LT

Equipped with a custom safety relay harness kit, with wiring instruction picture, our horn is very easy to install.

JSSG

JX